50KW Solar System, designed, installed and commissioned at The Lake District Coast Aquarium, Maryport.
Covering East, South and West elevations maximising the sun to its full potential
SJD Electrical is proud to have the maintenance contract at the above Newby West Solar Farm, which is a 5 Mega Watt power station.
9kw on a Welsh slate roof
Extra care always has to be taken. We use a 3 defence mechanism against the water ingress. Lead flashing was used for the underside and on the top side all with a very high standard water proof adhesive. We also used a lead slate for where the cables come out which has a rubber seal.
40kw Solar PV System
160 Black 250watt PV Panels
Installed and commissioned within 4 days
This system has a payback time of 6.5years
Read more about our solar panel installation services.